Sunday, August 7, 2011
Trim and Floor Northbrook Remodel
A lot of progress at the Northbrook Remodel. The half-inch limestone floor was installed in the kitchen and laundry room. Still to be grouted. The cabinetry in the laundry room and the secondary bathroom were installed. There is also a lot of trim up including crown, window, and door trim. The photo below shows the new kitchen. The sliding door was a small window above the sink and the large bank of windows were 2 smaller windows. The island will be located where you see the plumbing in the center of the photo. CLICK ON PHOTOS TO ENLARGE.